
Silt Curtain Supply & Installation
Site assessment, sizing, preparation, deployment and anchoring of silt curtain systems for dredging, reclamation, shoreline and marine construction works.
Farline Marine Engineering
Farline Marine Engineering
Protecting Today. Preserving Tomorrow.
Farline Marine Engineering Sdn. Bhd.
From silt curtain supply and installation to maintenance, relocation and marine support, we provide practical containment solutions for reclamation, dredging, port and shoreline projects across Malaysia.
Our Services
From survey and system design to supply, installation, maintenance and demobilisation, Farline provides end-to-end marine containment and project-support services.

Site assessment, sizing, preparation, deployment and anchoring of silt curtain systems for dredging, reclamation, shoreline and marine construction works.

Marine-grade silt curtains, floats, ballast systems, connectors, anchoring components and related accessories supplied according to project requirements.

Marine transport for authorised project personnel, crew movement and site access, subject to vessel capacity and applicable marine requirements.

Installation, positioning and maintenance of marker buoys and project navigation aids for designated marine work areas.

Inspection, cleaning, repair, adjustment and relocation of containment systems as site conditions and work fronts change.
Excavator support for shoreline, reclamation, earthworks and related site operations, with operators where required.
Site clearing, earthworks and supporting construction activities for coastal and inland project areas.
Vegetation control, planting, upkeep and reinstatement works for active and completed project sites.
How We Work
A structured project-delivery process designed to ensure the containment system remains suitable for changing site conditions and construction activities.
Review site conditions, water depth, current, work-front configuration and project requirements to determine suitable curtain depth, length, flotation, ballast and anchoring arrangements.
Confirm scope, quantities, installation methodology, manpower, marine equipment and mobilisation schedule before commencement of work.
Prepare, deploy, connect, anchor and position the silt curtain system in accordance with the approved work area and project requirements.
Inspect and maintain the installation throughout the project, carry out repairs or relocation where required, and safely recover and demobilise the system upon completion.
Compliance
Current company registrations, contractor certifications and supporting compliance documents are available for client and tender verification.
CIDB Grade G3 contractor registration. Categories, specialisations and validity are as stated on the current certificate.
View Certificate CIDBGovernment work procurement certificate. Field codes and validity are as stated on the current certificate.
View Certificate MOFRegistered under the approved supply and service categories stated on the current MOF certificate.
View Certificate SSMCompany registration with the Companies Commission of Malaysia.
View Certificate TNBTNB work-contractor certificate. Scope and validity are as stated on the current document.
View CertificateProjects
Selected silt curtain supply, installation, maintenance and relocation works undertaken for reclamation, port, shoreline and infrastructure projects across Malaysia.
Track Record
Farline Marine Engineering has undertaken silt curtain supply, installation, maintenance and relocation works for contractors and developers involved in reclamation, marine infrastructure, shoreline and port projects throughout Malaysia.
Clients
Organisations for whom Farline has provided silt curtain, marine support or related project services.
Logos are displayed solely to identify organisations associated with completed or ongoing project engagements and do not imply endorsement.
Coverage
Marine and silt curtain projects undertaken across Peninsular Malaysia, with mobilisation capability for additional locations subject to project requirements. Completed and active project locations include Johor, Port Klang, Kuala Linggi and Kedah.
The Farline Advantage
Containment and marine support planned around the site, the programme and the conditions on the water.
Structured planning, mobilisation and site coordination to support project schedules and minimise avoidable delay.
Containment solutions designed to support sediment-control requirements and environmental management measures applicable to the project.
Personnel experienced in silt curtain installation, maintenance and marine operations across a range of coastal and inland-water projects.
Maintenance, repair and relocation support to help keep containment systems effective throughout changing project conditions.
Support from initial assessment and installation through inspection, relocation, maintenance and final demobilisation.
Health, Safety & Environment
Site works are planned around personnel safety, suitable marine equipment and the sediment-control measures applicable to the project.
Scope, access, manpower and marine equipment are confirmed before mobilisation.
Activities are carried out by personnel briefed for the operation, using vessels and equipment suited to the site.
Silt curtain systems are installed and maintained to support the sediment-control requirements of the project.
FAQ
Typical packages run from about 2 m to 10 m skirt depth, matched to site soundings and current. Longer runs are built in connected panels.
Many coastal jobs mobilise within days to a few weeks after survey and quotation. Urgent works are prioritised where kit allows.
Yes — inspection, repair, relocation, and marker buoy support as the work front moves.
Full removal packages are available, including recovery of floats, fabric, and ballast.
Marine and silt curtain projects have been undertaken across Peninsular Malaysia, including Johor, Port Klang, Kedah and Kuala Linggi. Mobilisation to additional locations is subject to project requirements. See project coverage.
Silt curtain and marine works are site-specific — scope, curtain length and depth, site conditions, project duration, and compliance requirements all vary. Fixed website prices would be misleading, so we quote once we understand your project.
We provide a project-based quotation after a survey or scope review. Cost typically reflects curtain length and depth, mobilisation, installation and maintenance needs, and how long containment must stay in place. Share your site details and we’ll prepare a clear proposal.
Use the Contact section — WhatsApp Faiz, email enquiry.fme@gmail.com, or call the office on 07-5620770. You can also reach Faiz on +60 10-5676755.
Share the project name, location, approximate water depth, curtain length and desired mobilisation date.